Type Of Enclosure
|
Original / Photocopy
|
Attestation Required
|
Documents Recommended
|
Challan
|
Original
|
Not Required
|
Challan
|
Application Page with Sign
|
Original
|
Not Required
|
Application Page with Sign
|
FIRM Registration Certificate
|
Original
|
Not Required
|
FIRM Registration Certificate
|
Workshop License under Factories Act 1948
|
Original
|
Not Required
|
Workshop License under Factories Act 1948
|
Technical personnel with designation, educational qualifications and relevant experience
|
Original
|
Not Required
|
Technical personnel with designation, educational qualifications and relevant experience
|
Type of jobs executed by the firm
|
Original
|
Not Required
|
Type of jobs executed by the firm
|
List of Rectifier/Generator, Grinder, General Tools and Tackles, dye penetrant kit, expander and measuring instruments or any other tools and tackles under regulation 392(5)(i).
|
Original
|
Not Required
|
List of Rectifier/Generator, Grinder, General Tools and Tackles, dye penetrant kit, expander and measuring instruments or any other tools and tackles under regulation 392(5)(i).
|
Previous recognized certificate as Boiler Manufacturer
|
Original
|
Not Required
|
Previous recognized certificate as Boiler Manufacturer
|
Copy of the welder certificate to be enclosed
|
Original
|
Not Required
|
Copy of the welder certificate to be enclosed
|
Any Other Document 1
|
Original
|
Not Required
|
Any Other Document 1
|
Any Other Document 2
|
Original
|
Not Required
|
Any Other Document 2
|
Any Other Document 3
|
Original
|
Not Required
|
Any Other Document 3
|
Details of internal quality control system of the firm
|
Original
|
Not Required
|
Details of internal quality control system of the firm
|